Back Home |  RSS Posts
 

Casimir Effect Archives

Archive for the ‘Costume’ Category


20
February
Posted on Saturday, February 20th, 2010

As the title states we started Monday morning with nothing booked in this week which means we haven’t stopped since then. First order of the week was get our First Assistant Director sorted, then locations, then insurance. Things mostly went to plan. Firstly Monday marks three weeks to go before filming and it’s all systems go. I’ll be getting the last bits of everything sorted this week. However each week we will add a new desktop wallpaper, and we will try to offer something special each week to, if we can think of something. Read on for next weeks offerings….

Read More

Comments Off

 

15
February
Posted on Monday, February 15th, 2010

Well it’s been another hectic week in the Casimir Effect production hole, and this week is shaping up to be nonstop. I have insurance to get sorted, eBay auctions and locations and crew to start finalising. Cromwell Jackson suit has arrived, the much awaited Valentino Milan suit, all I can say it it’s very nice all of the costume department were there to open it and see. It was like a birthday. All I can say is Cromwell Jackson will look damn good, and hopefully in the next week or so we will have some pictures of Neil in costume….

Read More

Comments Off

 

8
February
Posted on Monday, February 8th, 2010

It’s been a busy day, not to stressful. Mostly going back and forth getting things arranged and moved. Most of today was taken up with arranging and signing for a storage area. Now we have one it’s all coming together. It’s going to cost us £90 a month compared to some places wanting to charge over £800 a month. At least when the wish list stuff starts to arrive we have somewhere to store it. I got exited today I thought another major costume had arrived, but when I picked it up it was the acceptance letters from Algonquin College…

Read More

Comments Off

 

7
February
Posted on Sunday, February 7th, 2010

Well it’s been a few weeks since our last update, and a busy few weeks it’s been, I haven’t had time to do anything much. This weekend was the first time I had a few evenings off. So I’ll put a lot of things in this post to get you back up to speed with where we are at the moment. The Clobber Our costume department is and running, we should have photos soon of the costumes as we get them done we get our publicity shots for each character. I have added them to the gallery for costumes. The…

Read More

3 Comments »